At a Village Board workshop in early 2024, newly elected trustee Joe Carlin asked his colleagues to consider a six-month pause on new multi-family building across all of Nyack, according to the Rockland County Business Journal. The board said no to a moratorium. Mayor Joe Rand told the workshop, "I'm willing to look at the zoning codes," and Trustee Pascale Jean-Gilles said, "I don't see a moratorium, but I can see a review of the codes."
Two and a half years later, that review has turned into a specific project with a narrower target. In October 2026 the Village Board named Carlin board liaison to a steering committee for a grant-funded zoning study of the Corridor Commercial zone along Route 59. The study will look at mixed-use development there, including the multi-family and live/work housing the village's 2016 Comprehensive Plan called for on the corridor.
For anyone comparing Nyack this winter, the Route 59 gateway is where the village's next real addition of newer housing is most likely to come from, and that corridor is still at the study stage. The study's draft recommendations aren't due until June 30, 2027. Any homes built there are years away, which leaves today's buyers choosing from the village's older housing and a handful of newer buildings.
Upper Main Street Was the Last Wave
To see why Route 59 matters, look at where Nyack's recent housing came from. The state-published NY Forward Strategic Investment Plan, dated December 2025, counts 3,559 housing units in the Village of Nyack in 2023. It says 275 units were added over the previous decade, mostly along Main Street between Midland Avenue and Route 9W. The projects behind that number are familiar to anyone who drives up Main Street from the river.
| Building | Address | Units |
|---|---|---|
| The Pavion | 66 Cedar Hill Avenue | 135 |
| Nyack Point | 263 Main Street | 33, all affordable |
| Gateway Lofts | 273 Main Street | 33 |
| Diana Place | 249 Main Street | 26 |
| The Montclare | 6 North Midland Avenue | 48 |
The Pavion started the run in 2017, and the four Upper Main buildings followed from 2018 on, according to the Rockland County Business Journal's 2024 report.
Even with that construction, the supply of rentals buyers and renters can actually find has shrunk. The NY Forward plan reports that listed rental inventory in the village fell 53%, from 165 units in 2019 to 77 in 2024. The same December 2025 plan puts one- and two-bedroom rents in newer buildings at $2,500 to $4,500 a month. It also names the limits on building more downtown. Open land is scarce. Some residents have pushed back on new multi-family buildings because of their high price points. Others worry new buildings may not fit a village where almost half the housing was built before 1960.
That pre-1960 share is why so many Nyack searches end at a Victorian or a mid-century house that needs work. If you're weighing that tradeoff, our guide to buying a historic home in Nyack covers what to look for.
Why the Next Site Is the Corridor Commercial Zone
Main Street's large sites are mostly built out, and the waterfront has its own history. The 128-condo TZ Vista plan on Gedney Street, later called Tidewater, saw its permits lapse in April 2023 amid litigation between the development partners, Nyack News & Views reported. That leaves Route 59. Nyack's 2016 Comprehensive Plan already pointed there. According to an October 2026 village packet, the Village Planner wrote that the plan identified the corridor for added uses to encourage economic development, including multi-family and live/work units.
The study is funded and staffed. The village secured a $200,000 grant contract from the NYS Housing Trust Fund Corporation and hired BFJ Planning. On October 8, 2026, the board appointed the steering committee. Its members include Carlin, Bill Batson for the Chamber of Commerce, ZBA chair Steve Knowlton, Planning Board chair Laura Rothchild, and Nicole Hines for the NAACP. The board minutes also record that Trustee Jean-Gilles asked to add a Central Nyack representative. The November 17 agenda carried a resolution to appoint Bobbie Gardner, president of the Central Nyack Civic Association. That resolution mentioned traffic safety at the intersection of Route 59, Waldron Avenue and Mountainview Avenue.
The planner's memo says the study is expected to take 14 months. Its scope includes real estate and development analysis, sewer and water capacity, a traffic study, fiscal analysis of individual sites, and massing models of what redevelopment could look like under new zoning. BFJ's contract calls for a corridor tour and two public workshops. The first will present early findings and gather input, possibly as a Saturday walking tour followed by an indoor session. The second will cover preliminary zoning concepts.
What Sits on the Corridor Today
The village's list of parcels in the Uptown Gateway study reads like a drive in from the Thruway.
On the south side, it runs from Kilby Street to Waldron Avenue and covers the Super 8 motel at 47 Route 59, Chase Bank at 49, a gas station at 53, and McDonald's at 55. It also includes medical offices at 8-10 Waldron Avenue and a parcel at 26-28 Upper Depew Avenue. On the north side are Old World Food Market at 40 Route 59, an auto store at 32 that the village list marks "for sale," and Treehouse Cannabis at 28. The property at 51 Mountainview Avenue is included in the study as well. So are the addresses from 2 to 14 South Highland Avenue, several of which share parcels with Route 59 frontage.
The best-known property on the list is the West Gate Inn at 26 Route 59. In 2013 Nyack News & Views recounted that Masis Parseghian bought the former Nyack Ice Pond land in 1963 and opened the West Gate Restaurant and Lounge in 1969, first as a Polynesian restaurant and piano bar. After a 1981 renovation and a Tito Puente performance, the lounge became a Latin music venue. A 2019 profile from the same outlet described the family's salsa and disco nights, its banquet space, and Lisa Dosch's award-winning cheesecake. The family-owned restaurant's website now advertises a daily breakfast buffet and catering.
The corridor is also active. Old World Food Market opened a second store in Orangeburg this fall, The Journal News reported. The Super 8 at 47 Route 59 has an active permit for an interior renovation that includes its rooms.
The Calendar the Village Has Set
The village wants the plan done before new buildings go up on the corridor. In an October 8 memo, Village Administrator Andy Stewart wrote that a time-limited pause on major construction "could help prevent the construction of a new building on a key parcel." The Village Board scheduled a public hearing on a draft moratorium for the corridor on November 17, 2026, and the draft is in the board's meeting packet.
The date to watch is June 30, 2027, when BFJ and the advisory board expect to deliver a draft Comprehensive Plan for the corridor and recommended zoning changes. The study isn't part of Nyack's $4.5 million NY Forward award. The village's NY Forward page says it runs on a separate grant.
What This Means if You're Comparing Nyack This Winter
Apartments or live/work buildings on Route 59 sit behind a study that reports in mid-2027, with zoning decisions, site plans and construction still to come after that. A buyer moving in the next year or so will be choosing from the Nyack that exists today, with newer units concentrated in the four Upper Main buildings and the Pavion, and older housing everywhere else. That supports the prices of newer units and well-kept older homes alike. It also means a renovated pre-1960 house competes with very little new construction for buyers who want move-in condition. If you're deciding between attached and detached homes, our comparison of townhouses and condos in Nyack covers the inventory you'll actually see.
The uptown streets are where that future shows up first. A house on South Highland Avenue, Upper Depew Avenue or Mountainview Avenue sits beside the corridor the study covers, and the board's stated goals for it are mixed use, traffic safety, walkability and better access to services for nearby residents. The two public workshops are where the shape of that edge gets discussed, and a buyer with a home nearby can attend and weigh in.
For background on how long Nyack's planning efforts can take, our post on the Burd Street lot along the riverfront walk covers a project with a plan and funding that still has no start date.
If you're looking at a home near the Route 59 gateway, or trying to decide whether an older Nyack house is worth its price when so little new housing is coming, I can go through the recent sales and the corridor timeline with you, street by street. Reach out to Jacqueline Vasquez for a buyer consultation, or request a home valuation if you already own nearby and want to know where your home stands before the study is finished.